We're aware of a global phishing scam impersonating employees via email, WhatsApp and Telegram, but no Cast UK systems have been breached.
Find out how to protect yourself here.
View all candidates

Operations/Warehouse Manager

Ref: 167221

Swindon, UK

£50,000

  • Permanent
  • Cost Reduction
  • Efficiency Improvements
  • Safety And Compliance

About the candidate

A progressive and dedicated Operations/Warehouse Manager bringing a wealth of experience in coordinating the activities of various departments including storage, production, sales, and distribution. Possesses an impressive ability to drive performance, reduce inefficiencies, and cut costs while maintaining a responsible, cooperative, and professional attitude towards operational challenges. Currently based in Swindon, this candidate boasts a proven track record of managing and motivating both individuals and teams to achieve organisational goals. They bring extensive experience from several industries and roles and have a particularly strong background in implementing efficient procedures, improving safety protocols, and managing significant improvements in productivity and performance.

What makes them great?

  • Spearheaded the redesign of production areas and workflows, accommodating an 80% increase in volumes.
  • Achieved a dramatic improvement in site procedures, attaining a right first-time rate of 98.63% for high-value industries like F1 and aerospace.
  • Directed major staff restructuring, achieving a 10% reduction in workforce while maintaining productivity and morale.
  • Revenue Impact: Played an integral role in scaling business operations, preparing for a surge in sales from 8 million to 20 million.
  • Efficiency Improvements: Achieved a 50% improvement in productivity by revamping pick, pack, and post operation.

     

Areas of expertise

  • Efficient Route Planning: Implemented a walk route that significantly increased pick performance.
  • Staff Training: Spearheaded comprehensive staff training programs aligning with anticipated sales increases.
  • Procedure Enhancements: Achieved a right-first-time rate of 98.63% in production for F1 and aerospace customers through meticulous procedural reviews.
  • Warehouse Design: Redesigned logistics and storage processes to accommodate substantial business growth and efficiency.
  • Cost Reduction: Led initiatives that drastically cut temporary labour needs and overall operational costs.
  • Safety and Compliance: Ensured sites adhered to highest safety standards, including gaining ISO 45001 status.

Request Introduction

Call Us

0333 121 3345

Email Us

hello@castuk.com